From Engineering Definition to Operational Readiness.

Coordinated project delivery for energy processing, compression, LNG, and associated surface facilities.

EPC project delivery

From design basis to operational readiness.

Select a delivery phase to build up the facility.
Rotate and explore the assembly at each stage.

INTERACTIVE 3D MODEL01 — 05 / EPC PROJECT DELIVERY
EPC project delivery — static alternative

Drag to rotate · Use + / − to zoom · Select a marker or equipment button. Keyboard: arrow keys rotate, + / − zoom, 0 resets.

Conceptual engineering illustration. Equipment geometry, connections and animated flow are illustrative, not a process simulation or a project design.

A successful EPC project requires consistent technical requirements, coordinated interfaces, disciplined procurement, effective construction planning, and a commissioning strategy aligned with the intended operating conditions.

Our proposed EPC offering connects engineering definition with procurement, fabrication, construction, and start-up planning to support a coordinated delivery process.

The exact scope and contracting responsibilities are defined for each project.

Engineering

Establish the Technical Foundation.

Engineering activities may include conceptual studies, feasibility assessments, front-end engineering design (FEED), detailed engineering, process simulation, equipment specifications, and multidisciplinary design coordination.

The objective is to translate project requirements into a coordinated design basis that addresses performance, safety, operability, constructability, and applicable regulatory requirements.

Procurement & Logistics

Align Equipment Decisions with Project Priorities.

Long-lead equipment and specialized components can influence the overall project schedule.

Procurement planning may address:

Procurement strategies are developed around the project schedule, technical specifications, commercial requirements, and supply chain constraints.

Modular Fabrication & Construction

Evaluate Modularization Where It Creates Project Value.

Modularization can reduce the amount of work required at the installation site and improve the coordination of fabrication, transportation, and installation activities when the project conditions are suitable.

Potential considerations include:

Modularization is evaluated against site-built alternatives rather than assumed to be the best solution for every project.

Commissioning & Start-Up

Prepare the Facility for Safe and Controlled Operation.

Commissioning and start-up planning establish the procedures and verification activities needed to prepare facilities for operation.

Depending on the contracted scope, activities may include:

Where integrated subsurface and surface support is included, start-up observations can also be compared with production assumptions established during development planning.